P R O J E C T S


Return to Home Page
About Us
Our Equipment
Products Used
Contact Us

Strathmar Trenching has completed many irrigation projects for golf courses in the Ottawa/Hull area.

These projects have ranged from complete installations for new golf courses, to renovations to irrigation systems on existing courses.

Strathmar has also done drainage for greens and fairways for several of these golf courses. We also do repairs to irrigation systems and pump house installations.

Drainage installation at Le Dome golf course.
 


Le Dome Golf Club

  Hole renovation ment re-routing the irrigation line.
Hole renovation ment re-routing the irrigation line.
New fairway is cleaned after install.
New fairway is cleaned after install.
  Another look at the fairway.
Another look at the fairway.
Drainage is complete and irrigation is going in at new green site.
Drainage is in and irrigation is going in at new green.
 


Kingsway Park Golf & Country Club

  Isolation valves are installed on fairway lines.
Isolation valves are installed on fairway lines.
Fairway is cleaned up and playable after install.
Fairway is cleaned up and playable after install.
  Typical installation for a green.
Typical installation for a green.
Automatic irrigation sprinkler head is wired for this tee deck.
Irrigation sprinkler head is wired for this tee deck.
 


Manderley on the Green

  Ditch Witch is used to cut trenches for the drainage tile.
3210 is used to cut trenches for the drainage tile.
Preparing a new green for drainage tile.
Preparing a new green for drainage tile.
  Typical Herring Bone Drainage pattern on a green.
Typical Herring Bone Drainage pattern on a green.
 


Club de golf Outaouais

  Installing irrigation pipes on the redesigned red course.
Installing irrigation pipes on the red course.
The 4010 is being used to open trenches in this fairway.
The 4010 is being used for trenching in this fairway.
  Addition of sprinklers in this golf holes rough area.
Addition of sprinklers in this golf holes rough area.
Clean up after the pipe and sprinklers are installed.
Clean up after the pipe and sprinklers are installed.
 


Predator at Greyhawk

  Looking down a fairway back to the Clubhouse at the Predator Golf Club.
Looking down a fairway back to the Clubhouse.
A hole is dug to install a sprinkler head.
A hole is dug to install a sprinkler head.
  Checking the spray pattern of an installed sprinkler.
Checking the spray pattern of an installed sprinkler.
Pump House is hooked up to the Z-pipe which takes the water out to the course.
Pump House is hooked up to the Z-pipe.
 


Stonebridge Golf and Country Club

  The Z-Pipe is installed on to the pump in the pumphouse.
The Z-Pipe is installed on to the pump in the pumphouse.
The steel Z-Pipe is in the trench and ready to be connected to the pvc mainline pipe.
The steel Z-Pipe is in the trench and ready to be connected to the pvc mainline pipe.
  Z-Pipe and the Pvc mainline are connected together with bolt on flanges.
Z-Pipe and the Pvc mainline are connected together with bolt on flanges
The connection between the two pipes is complete.
The connection between the two pipes is complete.

Home     About Us      Equipment      Products      Contact Us


Copyright © 2003 Strathmar Trenching Ltd. All Rights Reserved.